PIT-Tagged Wild Summer Steelhead Query Parameters | |
Year | 2016 |
Project | Little Goose |
River Parameter | Temperature |
Critical Temperature Value | 15 C |
Calculate Exposure | Above Critical Value |
River Parameter Data Fill | No |
Query Dates | 1/1 - 12/31 |
Total Run Period (Mar 24 - Jun 30) | |
Total Number of Fish Observed | 10409 |
Percent of Total Run Analyzed [Number Observed] | 100 % [10409] |
Temperature Exposure Index | 11.6 C |
Percent of Fish Exposed [Number Exposed] | 1.4 % [153] |
Number of Days Fish Exposed | 15 |
Middle 80% of Run Period (Apr 15 - May 20) | |
Number of Fish Observed | 8610 |
Percent of Middle 80% of Run Analyzed [Number Observed] | 100 % [8610] |
Temperature Exposure Index | 11.47 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Middle 50% of Run Period (Apr 22 - May 15) | |
Number of Fish Observed | 5527 |
Percent of Middle 50% of Run Analyzed [Number Observed] | 100 % [5527] |
Temperature Exposure Index | 11.64 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Run Dates | |
First Day of Run | Mar 24 |
5% of Run passed | Apr 14 |
10% of Run passed | Apr 15 |
50% of Run passed | Apr 30 |
90% of Run passed | May 20 |
95% of Run passed | May 24 |
Last Day of Run | Jun 30 |
Date(s) When Temperature Crosses 15 C | |
Jun 4 |