PIT-Tagged Wild Spring/Summer Chinook Query Parameters | |
Year | 2017 |
Project | Lower Granite |
River Parameter | Temperature |
Critical Temperature Value | 15 C |
Calculate Exposure | Above Critical Value |
River Parameter Data Fill | No |
Query Dates | 1/1 - 12/31 |
Total Run Period (Mar 21 - Jul 20) | |
Total Number of Fish Observed | 9462 |
Percent of Total Run Analyzed [Number Observed] | 100 % [9462] |
Temperature Exposure Index | 10.37 C |
Percent of Fish Exposed [Number Exposed] | 1.1 % [105] |
Number of Days Fish Exposed | 22 |
Middle 80% of Run Period (Apr 12 - May 23) | |
Number of Fish Observed | 7710 |
Percent of Middle 80% of Run Analyzed [Number Observed] | 100 % [7710] |
Temperature Exposure Index | 10.23 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Middle 50% of Run Period (Apr 16 - May 7) | |
Number of Fish Observed | 4925 |
Percent of Middle 50% of Run Analyzed [Number Observed] | 100 % [4925] |
Temperature Exposure Index | 10.33 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Run Dates | |
First Day of Run | Mar 21 |
5% of Run passed | Apr 9 |
10% of Run passed | Apr 12 |
50% of Run passed | Apr 24 |
90% of Run passed | May 23 |
95% of Run passed | May 28 |
Last Day of Run | Jul 20 |
Date(s) When Temperature Crosses 15 C | |
Jun 20 |