PIT-Tagged Wild Summer Steelhead Query Parameters | |
Year | 2017 |
Project | McNary |
River Parameter | Temperature |
Critical Temperature Value | 15 C |
Calculate Exposure | Above Critical Value |
River Parameter Data Fill | No |
Query Dates | 1/1 - 12/31 |
Total Run Period (Mar 29 - Jun 25) | |
Total Number of Fish Observed | 2230 |
Percent of Total Run Analyzed [Number Observed] | 100 % [2230] |
Temperature Exposure Index | 11.75 C |
Percent of Fish Exposed [Number Exposed] | 1.1 % [26] |
Number of Days Fish Exposed | 7 |
Middle 80% of Run Period (Apr 24 - May 31) | |
Number of Fish Observed | 1797 |
Percent of Middle 80% of Run Analyzed [Number Observed] | 100 % [1797] |
Temperature Exposure Index | 11.83 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Middle 50% of Run Period (May 3 - May 27) | |
Number of Fish Observed | 1182 |
Percent of Middle 50% of Run Analyzed [Number Observed] | 100 % [1182] |
Temperature Exposure Index | 11.85 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Run Dates | |
First Day of Run | Mar 29 |
5% of Run passed | Apr 18 |
10% of Run passed | Apr 24 |
50% of Run passed | May 16 |
90% of Run passed | May 31 |
95% of Run passed | Jun 5 |
Last Day of Run | Jun 25 |
Date(s) When Temperature Crosses 15 C | |
Jun 18 |