PIT-Tagged Wild Summer Steelhead Query Parameters | |
Year | 2018 |
Project | Little Goose |
River Parameter | Temperature |
Critical Temperature Value | 15 C |
Calculate Exposure | Above Critical Value |
River Parameter Data Fill | No |
Query Dates | 1/1 - 12/31 |
Total Run Period (Feb 22 - Jul 4) | |
Total Number of Fish Observed | 12626 |
Percent of Total Run Analyzed [Number Observed] | 99.95 % [12620]1 |
Temperature Exposure Index | 11.57 C |
Percent of Fish Exposed [Number Exposed] | 0.8 % [105] |
Number of Days Fish Exposed | 14 |
Middle 80% of Run Period (Apr 22 - May 25) | |
Number of Fish Observed | 10308 |
Percent of Middle 80% of Run Analyzed [Number Observed] | 100 % [10308] |
Temperature Exposure Index | 11.57 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Middle 50% of Run Period (May 2 - May 19) | |
Number of Fish Observed | 6634 |
Percent of Middle 50% of Run Analyzed [Number Observed] | 100 % [6634] |
Temperature Exposure Index | 11.28 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Run Dates | |
First Day of Run | Feb 22 |
5% of Run passed | Apr 16 |
10% of Run passed | Apr 22 |
50% of Run passed | May 10 |
90% of Run passed | May 25 |
95% of Run passed | May 28 |
Last Day of Run | Jul 4 |
Date(s) When Temperature Crosses 15 C | |
Jun 7 |