PIT-Tagged Wild Summer Steelhead Query Parameters | |
Year | 2021 |
Project | John Day |
River Parameter | Temperature Tailrace |
Critical Temperature Tailrace Value | 15 C |
Calculate Exposure | Above Critical Value |
River Parameter Data Fill | No |
Query Dates | 1/1 - 12/31 |
Total Run Period (Mar 2 - Jun 28) | |
Total Number of Fish Observed | 335 |
Percent of Total Run Analyzed [Number Observed] | 100 % [335] |
Temperature Tailrace Exposure Index | 13.63 C |
Percent of Fish Exposed [Number Exposed] | 22.6 % [76] |
Number of Days Fish Exposed | 17 |
Middle 80% of Run Period (May 2 - Jun 5) | |
Number of Fish Observed | 274 |
Percent of Middle 80% of Run Analyzed [Number Observed] | 100 % [274] |
Temperature Tailrace Exposure Index | 13.83 C |
Percent of Fish Exposed [Number Exposed] | 17.1 % [47] |
Number of Days Fish Exposed | 5 |
Middle 50% of Run Period (May 7 - May 30) | |
Number of Fish Observed | 178 |
Percent of Middle 50% of Run Analyzed [Number Observed] | 100 % [178] |
Temperature Tailrace Exposure Index | 13.67 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Run Dates | |
First Day of Run | Mar 2 |
5% of Run passed | Apr 22 |
10% of Run passed | May 2 |
50% of Run passed | May 18 |
90% of Run passed | Jun 5 |
95% of Run passed | Jun 7 |
Last Day of Run | Jun 28 |
Date(s) When Temperature Tailrace Crosses 15 C | |
Jun 1 |