Columbia Basin Performance Measures

PIT Tag Exposure Results

graph

PIT-Tagged Wild Spring/Summer Chinook Query Parameters
Year2024
ProjectJohn Day
River ParameterTemperature Tailrace
Critical Temperature Tailrace Value15 C
Calculate ExposureAbove Critical Value
River Parameter Data FillNo
Query Dates1/1 - 12/31
Total Run Period (Mar 18 - Jun 30)
Total Number of Fish Observed821
Percent of Total Run Analyzed [Number Observed]100 % [821]
Temperature Tailrace Exposure Index12.82 C
Percent of Fish Exposed [Number Exposed]8 % [66]
Number of Days Fish Exposed22
Middle 80% of Run Period (Apr 23 - May 31)
Number of Fish Observed668
Percent of Middle 80% of Run Analyzed [Number Observed]100 % [668]
Temperature Tailrace Exposure Index12.7 C
Percent of Fish Exposed [Number Exposed]0 % [0]
Number of Days Fish Exposed0
Middle 50% of Run Period (Apr 29 - May 23)
Number of Fish Observed428
Percent of Middle 50% of Run Analyzed [Number Observed]100 % [428]
Temperature Tailrace Exposure Index12.64 C
Percent of Fish Exposed [Number Exposed]0 % [0]
Number of Days Fish Exposed0
Run Dates
First Day of RunMar 18
5% of Run passedApr 19
10% of Run passedApr 23
50% of Run passedMay 7
90% of Run passedMay 31
95% of Run passedJun 12
Last Day of RunJun 30
Date(s) When Temperature Tailrace Crosses 15 C
Jun 7