The database will be unavailable for several hours on Saturday, January 10th, 2026, for system upgrades starting at 10am Pacific.

Individual Location and Parameter River Conditions Inventory by Year

SAN JOAQUIN RIVER Basin
San Joaquin R, Tracy Pumping Plant (TRP: CDEC)
Electrical Conductivity Inventory by Year
Location Parameter Calendar Year Data Points Day Range Date Range Calendar Year
Annual Daily Average
View
TRP Electrical Conductivity 2026 * 7 1-7 2026-01-01 : 2026-01-07 522.49 Graph | Data Table
TRP Electrical Conductivity 2025 354 8-365 2025-01-08 : 2025-12-31 378.13 Graph | Data Table
TRP Electrical Conductivity 2024 281 1-353 2024-01-01 : 2024-12-18 346.96 Graph | Data Table
TRP Electrical Conductivity 2023 360 1-365 2023-01-01 : 2023-12-31 288.43 Graph | Data Table
TRP Electrical Conductivity 2022 363 1-365 2022-01-01 : 2022-12-31 511.59 Graph | Data Table
TRP Electrical Conductivity 2021 365 1-365 2021-01-01 : 2021-12-31 618.64 Graph | Data Table
TRP Electrical Conductivity 2020 366 1-366 2020-01-01 : 2020-12-31 470.32 Graph | Data Table
TRP Electrical Conductivity 2019 293 62-365 2019-03-03 : 2019-12-31 261.73 Graph | Data Table
* Incomplete data year.